Patel Engineering Limited New Projects 2026 | Gongri Hydropower Project

हमसे जुरने के लिए ग्रुप को जॉइन करे
WhatsApp Group Join Now
Telegram Group Join Now

Patel Engineering Limited New Projects 2026 | Gongri Hydropower Project

Company Name

Patel Engineering Limited has taken a significant step toward strengthening India’s clean energy ecosystem by signing a Memorandum of Understanding (MoU) with the Government of Arunachal Pradesh for the development of the Gongri Hydropower Project.

This landmark initiative aligns with Arunachal Pradesh’s vision of becoming a major hydropower hub and is among the first projects to be revived under the state’s new Hydropower Revival Policy.

  • Project: Gongri Hydropower Project
  • Installed Capacity: 144 MW
  • Location: West Kameng District, Arunachal Pradesh
  • Estimated Project Cost: ~₹1,700 crore
  • Development Model: BOOT (Build–Own–Operate–Transfer)
  • Concession Period: 40 years
  • Execution Timeline: Approximately 4 years

This initiative goes beyond power generation and is expected to deliver wide-ranging benefits:

  • Strengthening renewable energy capacity in Northeast India
  • Generating substantial local employment opportunities
  • Boosting regional infrastructure and economic growth
  • Supporting sustainable and environmentally responsible development

With this MoU, Patel Engineering Limited further reinforces its role as a key contributor to India’s hydropower and infrastructure journey, advancing a greener, more resilient, and energy-secure future for the country.

5 thoughts on “Patel Engineering Limited New Projects 2026 | Gongri Hydropower Project”

Leave a Comment